Liebherr HS 875 HD - BAM Grondtechniek

The Liebherr HS 875 HD heavy duty crane of BAM Grondtechniek doing a slurry wall grab job at the second Maasvlakte (NL).

Two quays of 1250 and 650 meter long must be digged out here, up to a depth of 38 meters.

Together with the Liebherr HS 875 HD of Volker Staal Funderingen and a HS 875 HD of Zwagerman VMT.

Fitted with a 23 meter main boom.

The crane has a 900 hp MAN engine to drive the heavy pumps, each crane function has his own pump.

For the slurry wall grab job are two 30 tonne winches used, a lifting- and a closing cable.

The two-part counterweight weights 24.1 tonnes.

The crane will work here some good two years.

Back to the Liebherr menu